Coordinated with Forest Service for help to get some work done at Cayuse. Got the windsock down (with required 4×4 and cable), installed a diagonal brace on frame to prevent winter snow load from bending, lubed the bearings (it an old antique 70+ years frame with real roller bearings – don't make them like that anymore) and installed new 18 inch sock. Painted the runway threshold markers, cut two cottonwoods down that were blocking the windsock. Cut and piled a bunch of lodgepole and cottonwood saplings beginning to encroach on edge of airstrip NW side approach end. Ran out of paint and time for segmented circle but will get that painted in week or two. New sign on grave site adjacent to airstrip.
Recent Comments